Short description: Challenge Owner buys energy and then distributes it to its contractors. Electricity supplied to the port may have a disturbance level which in the long run may have a negative impact on the operation of devices, increase the failure rate and shorten their service life.
Market potential: Energy distributing institutions, ports.
Timing: As soon as possible.
Desired result: It is necessary to design a system that will minimize interference and improve the quality of electricity. Efficient equipment will reduce failure rates, thus contributing to increasing the efficiency of transshipments and reducing the carbon footprint through shorter stays of ships in port.
Information on challenge owner: Mid-Cap (250-3,000 staff).
Market presence of challenge owner: Active in one country.
Keywords: Power grid and distribution; Energy Efficiency; Smart Appliances; Applications software; Managing system